Another Saturday and to trail builders like us, more help coming.
After one nice lap of warm up ride, the trail crew gathered at Grave Drop again.
We split the work among the 15 volunteers, with William, Ellery, Joshua and Nik taking care of the entrance choke and rocks. Ken, Ling, Ming, Max and insect stunk me handled the ‘hole’ before ‘Ling’s step’.
55 and Kee join in halfway after completing some other task, and Soon added his meticulous touch to the rock garden.
the work continues through the long rainy afternoon, with the last hour powered by pure adrenaline of completion, pushing the biggest drop rocks into place for the bottom.
Gravedrop ended up as a sweet north-shore like ride, lots of stale rock and good technical riding needed.