Today we concentrated on the stairway. The slope of the stairway is to be retained and we will need to make it ridable, somehow.
The day started by cutting down the bushes on right side of the staircase (left on the picture below), expose the 2ft drop, align the drop off exit by taking some of the walkway off.
Bakau lining is then hammered in at the edge to prevent any erosion on the trail, and 2 bags of rock pebbles are pounded on to the ride slope itself as armoring.
the equally tough part of getting 10 bags of pebbles, creating 15bags full of sandbags from the external road in the park and dragging them into the trail fill the earlier half of the afternoon.
Certainly not the post-lunch exercise we are looking for, especially the labour workforce consist of Nik, Max and me, and later with some help from Reb
At around 3pm we finally got this up…
the last part of the afternoon, is filled with more spading and spreading of pebbles. These were accidentally pilled up throughout the last 1/3 of the trail (not including those of the crazy road climb), starting from 50 metres from the 3rd bridge.
Pebbles and rock chips works both way. It harden the muddy soil and bog, yet overdoing it made the trail slippery and unridable at the same time.
the fix seems to work, while the 4 person workforce that we gathered toil through the sandbag dragging and spading, clearing around 50 metres of the trail of pebble piles.
some statistics
4 manhour for the staircase drop
6 manhour for the sandbagging
7 manhour for the 50metres of trail ride surface before the 3rd bridge.